午夜精品电影,99re热精品视频,在线亚洲+欧美+日本专区,欧美第6页,中国黄色片视频,四虎成人永久,一区二区三区四区五区在线

軟題庫 移動APP 掃碼下載APP 隨時隨地移動學習 培訓課程
試卷名稱 信息安全工程師英語試題匯總
考試中心《信息安全工程師英語試題匯總》在線考試
試卷年份2016年下半年
試題題型【單選題】
試題內容

The reason for establishing a stop or freezing point on the design of a new system is to: 
A、prevent further changes to a project in process. 
B、indicate the point at which the design is to be completed. 
C、require that changes after that point be evaluated for cost-effectiveness. 
D、provide the project management team with more control over the project design. 


相關試題

推薦文章